Previous Projects

image286

Alice I.S.D

Prime was heavily involved in several renovation projects for the Alice Independent School District.   Many of the buildings were in dire need of renovation and the total cost for all the renovations for Alice ISD was in excess of $1.2 Million Dollar.  We received high praise from the district and its staff for our professionalism, integrity, and quality workmanship.

Alice High School

• Restrooms – paint, flooring

• Storage building – roofing

• Weight room – metal roofing, garage doors

• Bus Stop – new metal canopy

• Art Patio – roofing

• Security Shed – roofing

• Culinary Room – demo, wall repair and painting

• Storage Building – new construction


Memorial Stadium

• Concrete entryways

• Metal canopies – repaint, demo, and new construction

• Field house storage – demo, rebuild

• Bleachers – repaint

• Press box – repaint

• Roofing


Maintenance Department

• Roofing

• Concrete pad

• Bus garage – roof, exterior paint

• Central supply – roof, exterior paint

• Covers – roof

• Transportation – roof, exterior paint

• Garage Storage – roof, exterior paint

• Maintenance shop – roof, exterior paint

• Walk-in freezer – demo, roofing

• Bus shop – new build of metal canopy

• Automotive shop – perimeter fence

• Garage doors – new installation


Memorial Intermediate School

• Administration building – roof (gravel)

• Break room – cabinet work

• Science lab – cabinet work

• Interior repaint

• Bus stop – new metal canopy, paint, concrete pad

• Band hall and stage – demo, paint

• Restrooms – demo, rebuild

• Roof – gutter and downspouts

• Cafeteria/Dining area- wall repair, exterior paint


Salazar Elementary

• Ceiling – vent hood installation

• New playground canopy

• Concrete walkways

• Steel support structures – anchor, sand blast, paint

• New flooring

• Front offices – remodel

• Library – ceilings and walls

• Skylights – repair and repaint


More Projects

Beeville ISD

A.C. Jones High School

Gymnasiums, Auditorium and Field House to include concessions, restrooms, Athletic Area:

• Interior Painting

• Accent Bands

• Exposed Gym Structures


Hampton-Moreno-Dugat Early Childhood

• Build Canopy / Bus Stop


R.A. Hall Elementary

Administration building




Whataburger Field

  • Exterior Epoxy Painting 
  • Interior Drywall Finishes

Tuloso Midway ISD

Intermediate School

• Remove & Recaulk Expansion Joints

• Paint All Interior Drywall

• Paint Previously Painted CMU

• Refinish Interior Natural Doors

• Paint All Metal Doors & Frames

• Exterior Waterproofing

• Flag Mural

Administration 

• Office remodels




Corpus Christi Airport

  • Canopy and Beams


Corpus Christi Housing Authority

Treyway

McKinzie

Andy Alaniz

Corban Townhomes

Hampton

Parkway

La Armada

City of Corpus Christi

Greenwood Senior Center

Lindale Senior Center